>

Disclaimer: The views and opinions expressed in this article are those of the author and do not necessarily reflect the views of the Arboricultural Association.

Share this story

Topics

#ARBatwork #ArbMatters #EmbraceEquity #IWD2023 #PledgeLessPlastic #WomenInArb #WomenInTrees & 12 Faces of Arb 1987 storm 2 Rope 2018 2024 30 Under 30 3ATC 3ATC UK Open 50th annual AA AA award AA Awards Aboricultural Association Accident accreditation Addiction advice AFAG AFL aftercare AGM Agrilus Biguttatus aid air quality Alert Alex Kirkley All Party Parliamentary Group on Horticulture amenity Amenity Conference Anatomy Ancient Tree Forum Annual Awards Anthropology APF APF 2020 APF 2022 app APPGHG application Appointment apprentice apprenticeship Apprenticeships Approved Approved Contractor Approved Contractors ARB ARB Approved Contractor ARB Approved Contractors ARB at work ARB Magazine ARB Show arb training ARB Worker Zone ArbAC ARBatwork ArbCamp Arbor Day Arboretum Arboricultural Association Arboricultural Journal Arboricultural Student Arboriculture arborists Arbsafe Ash Ash Archive ash dieback Asian Hornet Assessments Assessors at atf ATO Australia Autumn Review award Awards Barcham Trees Bark Beetle Bartlett Bartlett Tree Experts bats Bats & Trees beetle Best Student Award beyond ism Bill Matthews biochar biodiversity Biodiversity Net Gain biomechanical biosecurity BNG Book Prize Book Shop Booking Books Bookshop boundaries branch Branches brand Brexit bs5837 BSI Budgeting Tool bursary business Call for Abrstacts Call for Abstracts Call for papers Campout Canker stain of plane Canopy Climbing Collective carbon career careers Cavanagh CAVAT CCS Cellular Confinement Cellular Confinement Systems CEnv CEO Ceratocystis Ceratocystis platani chainsaw chalara charity Charles charter Charter for Trees Chartered Environmentalist chelsea Chelsea Flower Show City & Guilds Claus Mattheck climate climate change climber climbing code Cofor Colleges committees competition competiton conference Conference India Confor conifers conservation Consultant consultation Continuous Professional Development Contractor Contractor Focus Contractors Cornwall Cornwall Branch Coronation Coronavirus Coroner Council Countryside Countryside Code Countryside Stewardship Course for beginners COVID-19 CPD cross industry news Crown & Canopy Cryphonectria parasitica Cumbria DART Date for your diary deadwood death debate Debt defra deployment Design Devon Director disease diversity DMM document donate dothistroma downloads draft Drought Dutch elm DWP EAC East Anglia ecology Economic Report economy Ecotricity education EFUF Election elections Electricity Elm yellows Emerald Ash Borer England England Tree Action Plan England Tree Strategy English Elm environment Environment Act 2021 environmental EPF Equality equipment Equipment Theft Europe European Arboricultural Council European Forum on Urban Forestry European standards European Wood Pastures EUSTAFOR Event exeter Exhibitors Fall from Height Fatal Fatality felling Fellow Fellow Members Fera Field Trip Finance Fine firewood First Aid FISA flood flooding for Forest Research forestry Forestry Commission forests freelancers FSC Fund4Trees funding fundraiser fungal fungi Future Flora Futurebuild gardening GDPR Geocells Gold Medal Gov.uk government grant grants Grapple Saws Green Brexit Green Infrastructure Green Infratructure Green Recovery Green Up Guarantee guidance Guidance Note Guidance Note 2 guide guides Hazard Tree Health heart-rot Heatwave Hedgerow hedges height Helliwell Help Henry Girling Henry Kuppen History HMRC HOMED Homeworking Honey Brothers honours Horse Chestnut HortAid horticulture horticulturists HortWeek housing HRH HRH Prince Charles HS2 HSE HTA ICF ICoP identification Immigration import industry Industry Code of Practice industry skills Infographic InfraGreen Initiatives Inspiration Insurance Intermediate Tree Inspection International Urban Forestry Congress International Women’s Day International Year of Plant Health invertebrates Investigating Tree Archaeology Conference IPAF Ips typographus Irma irrigation ISA iso ITCC i-Tree IUFC IWD21 Jo Hedger Job Job Centre Plus job opportunity Jobcentre Plus jobs judgement JustGiving Karabiner Keith Sacre Kent Kew Kit land-based Landsaping Landscape Institute Landscape Recovery Scheme Landscape Show landscaping Lantra law Leaf Minor Lectures legal legislation Letters Liability licence Local Authority Treescapes Fund London longevity LTOA Lynne Boddy Magazine Malawi Managegement Plan manifesto maple Mayor of London MBE Melbourne Member Benefit Member Survey Membership Mental Health mentor MEWPs Midlands Morphophysiology moth' motion Moulton College Myerscough NASA National Geographic National Hedgerow Week National Tree Safety Group National Tree Week NATO Natural England NatureScot Netherlands New Year’s Honours News NHS nominations Northern Northumberland Notice notification NTIS NTOA NTOC NTSG Nurseries oak 'oak Oak Processionary Moth Oak-boring Beetle obituary Observatree occupation of OHRG online opm Padua Papua parks parliament Perennial Pests & Diseases Pests and Diseases Petersfield petition Petzl photo Phytophthora Phytophthora pluvialis Pine Processionary Moth plan planning Planning Law Plant Health Plant Healthy planting Plantsman Plantsmans Choice Pledge Plumpton College policy poll Poster Power PPE practice Preston Twins Prince Charles Prince of Wales processionary Product Recall Professional Members prosecution Protect and Survive protected tree protection PUWER Qualifications Queen’s 70th Jubilee Questionnaire Quotatis ramorum RC Recruitment Red Diesel reference Reg Harris Registered Registered Consultant Registered Consultants Rehab Rememberance Day renewal REnvP Report Rescue research Research grant Resilience response results Retirement retrenchment review RFS rhs RHS Chelsea Flower Show Ride for Research Ride4Research rigging Rodney Helliwell rogue tree surgeons Royal Forestry Society RSFS Safe Working Practice Safety Safety Bulletin Safety Bulletins Safety Guides Safety Notice Saftey Salaries Sale school science Scotland Scotland Branch Scottish Branch SDG Accord security Seed Gathering Season Seminar seminars Share Sheffield Show Sierra Leone Site Guidance skills skills survey SocEnv Social Benefits of Trees soil soils South East South East Branch South West Speaker spotlight SRT SRWP staff Standards statement Stationary Rope Stationary Rope Technique statutory STIHL Stonehouse Storm strategy student Student Book Prize Student Conference Study Trip Sub-contractors Succession Successsion Supporter survey Sustainable Soils Alliance Sweet Chestnut sweet chestnut blight Sycamore Gap symposium T Level T Levels Tatarian maple TDAG Technical technical guide Technical Guides technical officer Technical Officers Technical Team Technician Members Technology Ted Green Telecommunications tender TG3 Thames & Chiltern The Arboricultural Association The Forestry and Woodlands Advisory Committees The Plantsman’s Choice The Queen’s Green Canopy The Woodland Trust Thinking Arbs Thinking Arbs Day Timbersports Tony Kirkham Tools top-handled chainsaws,Elcoat, TPBE4 TPO Trading Standards trailblazer training transport Tree Tree Care Tree Champion Tree Council Tree Fayre tree felling Tree Health Tree Health Week Tree Inspection Tree Life tree loss tree management Tree of the year Tree Officer Tree officers tree pathogen tree planning Tree Planting Tree Production Innovation Fund Tree Protection tree register Tree Risk Tree Shears tree species Tree Supply Tree Surgeon Tree Surgeons Tree Week Tree Work at Height Tree Workers Zone TreeAlert Treeconomics tree-felling TreeRadar trees trees' Trees & Society Trees & Sociey Trees and Society Trees and the Law Trees for Cities Trees, People and the Built Environment trust' trustee Trustees TrustMark Two Rope two-rope UAG Uitlity UK favourite UK&ITCC ukas Ukraine UKWAS urban urban forest Urban Forestry Urban Tree Challenge Urban Tree Challenge Fund Urban Tree Cover Urban Tree Diversity Urban Tree World Cup urban trees UTD4 Utility Approved Contractors Utility Arboriculture Group UTWC vacancy Vanuatu VETcert veteran trees video Videos Virtual ARB Show volunteer voting VTA WAC Wales Wales Branch Warning Watering watering solutions Webinar webinars website Wednesday Webinars Wellbeing Western Westonbirt Wharton White Paper WIA Witley Women Women in Arb women in arboriculture Womens Arb Camp woodland Woodland Carbon Code Woodland Carbon Guarantee woodland trust woods Work Work at Height Workshops World Environment Day World Fungi Day Xylella young Young Arboricultural Professional Young Arboricultural Professional Award young arborists Young People’s Breakfast Event Young Tree Aftercare Youth Programme zoo

Two-rope working – an update

Author:  Simon Richmond, AA
  27/11/2019
Last Updated:  27/01/2020

Simon Richmond, Senior Technical Officer

Following the announcement in the Autumn issue of the ARB Magazine (issue 186, page 7) that the HSE is now requiring full compliance with the Work at Height Regulations in relation to tree climbing operations, there has been much discussion and debate.

The relevant section of the Regulations is Schedule 5, which addresses requirements for personal fall protection systems. See www.legislation.gov.uk/uksi/2005/735/schedule/5. The HSE has observed that some aspects of these requirements have been largely ignored by many climbing arborists, and that current training and assessment standards do not adequately address these issues.

The HSE has provided details of reported fall from height accidents for a one-year period, which can be viewed on the AA’s website: www.trees.org.uk/2ropes-incidents. The background to this wider issue can be viewed here: www.trees.org.uk/2ropes.

The Association has been in discussion with many other organisations, businesses and individuals over the past few months to ensure that, as a sector, we are taking a proportionate and practical position in response to this development in HSE policy.

One of the most urgent concerns of many people is that HSE is reminding us that as these Regulations are current (and have been in force since 2005), all operators should be compliant immediately. While the HSE does not intend to focus particularly on our industry in terms of its inspectors’ activity, it has stated that in any investigation following an incident involving tree climbing, it would expect employers and the self-employed to be compliant with the Regulations.

This creates a period of insecurity for our sector, as we do not yet have detailed industry guidance in place to help practitioners accurately interpret the requirements in order to be compliant and to make informed practical decisions in planning and carrying out their daily work.

Working with our colleagues and other stakeholders we have developed a timetable for introducing the required guidance.

Implementing changes to tree climbing guidance: use of two climbing lines

Objective
Completed by

1

Devise and agree basic, principal guidelines for climbing using two lines – to be disseminated to training instructors and the wider industry.

November 2019

2

Revise and update the Industry Code of Practice for Arboriculture – Tree Work at Height (ICoP) – Principal guidelines for the ‘Responsible person’ and ‘Competent person’.

January 2020

3

Revise existing draft of the forthcoming AA Technical Guide: Tree Climbing and Aerial Rescue (TG1) – Including detailed, practical guidance on the implementation of the use of two lines.

March 2020

4

Integration of TG1 guidance into national training content.

Spring 2020

5

Integration of TG1 guidance into national assessment standards.

Spring 2020

The work on revision of the ICoP is progressing well and the HSE has agreed that the following hierarchical approach should form the basis of planning tree climbing work at height:

Hierarchy of approach for use of two lines
 

These principles will apply to all tree climbing operations and offer a planned approach, subject to any detailed decision making if points 1 or 2 are not possible. It is anticipated that situations where the use of a single fall protection system is compliant will be rare and of short duration. At this stage the emphasis is on all fall protection systems, regardless of whether they incorporate doubled/moving rope technique (MRT) or stationary rope technique (SRT) or a combination of the two.

Basic practical guidance

At a recent meeting of Lantra Awards Aerial Tree Work Verifiers, a basic set of practical guidance was agreed which has been disseminated to registered instructors to provide initial direction for training that is being delivered currently. There will be further workshop sessions for instructors, but it is recognised that until the full and comprehensive guidance is published in the forthcoming AA Technical Guide, there remains a gap in detailed provision.

Access

1. Rope Advance System

  • Have 3 viable systems prior to leaving the ground (2 climbing lines, 1 lanyard). Install systems 1 & 2 (2 climbing lines) from ground. Test each system. Ascend to first anchor.
  • Maintain 2 climbing systems at all times
  • Repeat to final anchor point.

2. Throw Line

  • Install 2 separate climbing systems and if possible do so on independent anchors. Test systems independently. Ascend.

Working in the tree

  • Select 2 separate load-bearing anchors where possible and install 2 separate climbing systems. Test systems independently.
  • Work using 2 independent climbing systems.

Descent

Both primary and secondary working systems should be long enough to descend to the ground.

Rescue

A single line system may be acceptable in a rescue situation.

Frequently asked questions

We have been fielding queries on this topic for a few weeks now and will keep this list and the Two-Rope Help and Advice web page updated to provide answers – here are some examples of the most common questions:

FAQs

1.

Q: What happens in aerial rescue situations when 2-rope makes rescue more difficult?

A: It is acceptable to perform aerial rescue from one personal fall protection system.

2.

Q: Will there be a list of scenarios where 2 rope exemptions could apply? E.g. if you are able to rule it out categorically in risk assessment

A: It is unlikely industry guidance will be able to provide specific scenarios, due to the variation of canopy structures within which arborists work. Guidance will be written to inform operators as to the factors they must consider prior to single line working.

3.

Q: I think HSE’s interpretation of the law is wrong. Why can’t we lobby them to change the law?

A: As part of the process of working with the HSE over the last six months, the AA have continually questioned their (HSE) interpretation and will continue to do so where relevant.

4.

Q: To what extent will contractors be held accountable in the period until training and full detailed guidance has been made available?

A: HSE have stated that the Regulations apply now, and therefore employers and the self-employed should be complying with them.

5.

Q: What face-to-face training and other resources will be available?

A: Resources are to include:

Revised Industry Code of Practice (ICoP: Tree Work at Height);

Technical Guide 1: Tree climbing and aerial rescue;

Lantra Awards have adjusted their tree climbing training, which also includes their refresher provision;

The AA intend to run update/information seminars or workshops in Spring 2020.

 

6.

Q: Will a draft of the updated guidance be made available to have a look at prior to it being finalised?

A: Yes, an industry consultation on the Technical Guide will be held once the draft is ready.

7.

Q: Is the Arb Association going to support contractors / advise industry that work will take longer on 2 ropes and costs will be higher and there will be additional training costs to get everyone up to date?

A: It is acknowledged that this change may mean that work takes longer and this in turn may result in higher costs for compliant contractors. The AA will support the industry in promoting the higher professionalism that this brings.

8.

Q: Will reasons for briefly not using 2 rope system be required to be written on risk assessment or will verbal risk assess be ok?

A: In accordance with current legislation, where the employer employs five or more employees, the significant findings of the risk assessment must be recorded. It would therefore be anticipated that common factor or generic risk assessment may identify the circumstances when a single personal fall protection may be used.

9.

Q: Why is the Arb Association implementing this?

A: This change in practical guidance and support from the Arb Association has come as a direct result the HSE’s insistence that the industry has not been fully compliant with the Work at Height (WaH) Regulations to date.

10.

Q: Why, if we have always used a 1 rope system, is this now not considered safe?

A: The view of the HSE is that, given the number of falls from height in our sector (of climbing arborists), our current guidance and the standards we have been working to can be improved.

The HSE have also stated the use of a single personal fall protection system as the norm during tree climbing operations does not meet the requirements of the WaH Regulations.

11.

Q: Will both ends of the same rope suffice or does it need to be 2 separate ropes?

A: This point does require further discussion with the HSE to determine the standard they would expect to see and whether such systems would be practical to adopt.

It is likely that under certain circumstances the use of the same rope to create two separate load bearing anchor points will be acceptable.

12.

Q: I do not feel this is a safer system so can I always risk assess to not use it?

A: When using a work positioning system (moving rope techniques) and it is not reasonably practicable to include a backup as part of your system then a single system may be used.

When using a rope access system (stationary rope systems) and the use of a second line would entail higher risk then a single system may be used.

13.

Q: Will both ropes have to reach the ground?

A: New technical guide has been drafted stating that at least one of the systems in use by the operator must be capable of providing an uninterrupted descent to the ground (i.e. without the need for a change of anchor) from any point within the canopy in the event of a self-rescue being required.

During descent under normal climbing conditions, the climber will need to ensure that they remain connected to two systems for the duration of their descent.

14.

Q: When will there be set definitions, that won’t change, of such things as stationary rope work positioning, moving rope work positioning etc?

A: These definitions will be developed as part of the revision of the ICoP and the new Technical Guide.

15.

Q: In a self-rescue situation can one rope be disconnected to allow one handed descent?

A: It is acceptable to resort to a single personal fall protection system in an aerial rescue.

16.

Q: As a contractor when should we be putting this new system in place?

A: The principle of using two separate load bearing anchor points should be in place immediately.